Client: Free Zone Utilities LFTZ (Tolaram Group)
Installation Of Vertical Turbine Fire Pump (1250 GPM @ 10 Bar) Project
Year of Completion: 2025

Client Challenge
Fabrication, welding, and installation of 8-inch STD pipes and fitting the fire pump inside the utility house in SIF 05
Purpose
It is proposed to supply water to the newly constructed standard industrial facilities (SIF02, SIF03, SIF04, and SIF05 respectively
Solution
not available