Client: Free Zone Utilities LFTZ (Tolaram Group)
Supply and installation of Chilled Water Pipeline (With Hopepies, Rockwool insulastion & AC Cladding). Installation of Air Compressor Line OP = 25 BAR
Year of Completion: 2024

Client Challenge
The supply, fabrication and erection of plant air using SS pipe 80s TP 304 and it's fitting pressure at 25 BAR The supply, fabrication and installation of HDPE pipes with the use of Butt fusion weld for (2 NOS) Prasad Chiller Pressured at 16 BAR and insulated with polystyrene and aluminum cudding
Purpose
It is proposed to supply air and chilled water to Guala closure (GC) machine inside it's plant
Solution
not available